Name
Deepwater Operations (DWO): FPU Top Tensioned Riser Repair
Date & Time
Wednesday, November 9, 2022, 1:00 PM - 1:30 PM
Shane Graishe Muhammad Murtaza
Description

Upon identification of a leak point near the water surface on a 12-inch top tensioned riser, a custom fit-for-purpose remediation system was designed and installed to provide structural integrity and pressure containment. The challenges faced during design, testing and installation of the repair will be discussed.

Location Name
Hall A